Rampion Offshore Wind Farm Timeline

27th November 2017

The first turbine at the Rampion Offshore Wind Farm went online on 27th November 2017

RampionWindFarm Worthing

4th April 2017

An 80-tonne excavator used in the construction of the Rampion Offshore Wind Farm is stranded at sea.

RampionWindFarm Worthing

16th July 2014

Rampion Wind Farm Ltd. was given development consent to build an offshore wind farm and ancillary works

RampionWindFarm Worthing

Primary Sidebar

Timelines

Worthing 3CLY WorthingPier TheDome TheOdeon ThePlaza RampionWindFarm Woolworths Aquarena TheConnaught BHS HillBarnGC 34CLY 4CLY Montgomery Noor Inayat Khan

Footer

Footer #1

Footer #2

Footer #3

Worthing Revealed is a participant in the Amazon EU Associates Programme, an affiliate advertising programme designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.co.uk

  • On Facebook
  • On Pinterest
  • Resources

© 2017–2026 · Site by Powerhut · Built on the Genesis Framework